THE PROJECT

The project included asbestos abatement and demolition of the former DTE Marysville Power Station and thirteen outbuildings. AKT Peerless provided oversight and air monitoring during the abatement of asbestos containing materials (ACM) based on an initial asbestos survey performed by others. Additionally, suspect materials not previously identified during the initial survey were sampled by AKT personnel to confirm asbestos content. 

OUR ROLE

AKT Peerless conducted limited air monitoring and project oversight during abatement of regulated asbestos containing pipe insulation, boiler insulation, duct insulation, conduit wrap, boiler/duct gaskets and caulks at the project site. During abatement, AKT Peerless reviewed setup of regulated work areas, negative pressure enclosure integrity, abatement methodologies and effectiveness of final cleanup. Upon completion of abatement and in advance of air clearance, AKT Peerless conducted a visual inspection of regulated work areas to confirm effective removal of ACM. 

AKT Peerless performed air monitoring associated with the project to comply with regulatory requirements. Sampling pumps were pre- and post-calibrated using a secondary rotameter calibrated to a primary standard. Outside work area sampling was conducted during friable abatement to ensure airborne fiber levels were below regulatory limits. Personnel sampling was performed during abatement to ensure compliance with MIOSHA requirements. Post abatement air monitoring was performed after the work was completed to confirm compliance with the Michigan clearance standard. 

Air sampling results indicate airborne fiber levels during and after asbestos abatement remained within regulatory limits. Final clearance levels were below the Michigan required clearance level of 0.05 fibers per cubic centimeter (f/cc) of air in all clearance locations. 

THE RESULTS

AKT Peerless reviewed abatement work practices for compliance with OSHA and EPA requirements and completed asbestos abatement monitoring.  Air sampling results indicated airborne fiber levels during and after asbestos abatement remained within regulatory limits.  Further, AKT Peerless conducted a post abatement visual clearance inspection to confirm the removal of abated ACM and determined that abatement and subsequent cleanup and disposal met regulatory criteria. In addition to meeting environmental compliance requirements, the successful ACM abatement prepared the structures for maximum recyclability of building materials. 

Our Other Projects

Former Middle Grounds Landfill, Bay City, MI

Fire Station, Bay City, MI

HUD Environmental Assessments, Akron, OH

Surrey Square Shopping Mall, Norwood, OH

Due Diligence and Risk Reduction Program for K. Hovnanian Homes Real Estate

Preacquisition Due Diligence, Cincinnati, OH

Construction Loan Monitoring for Queen City Textile Building, Cincinnati, OH

Construction Loan Monitoring for MAGNET Headquarters, Cleveland, OH

Archdiocese of Detroit (AoD) AHERA School Management

Gasoline Station and Convenience Store, Toulon, IL

Salt Shed, Chicago, IL

AKT Peerless New Development Downers Grove IL

New Development, Downers Grove, IL

Vacant Lot turned New Development, Mount Prospect, IL

Riverfront Campus Redevelopment, Saginaw, MI

North Peak Brewery, Bay City, MI

U.S. Post Office ACM Abatement Management, Bellevue, MI

Saginaw Public Schools, Saginaw, MI

The Albion at Oak Park, Oak Park, IL​

Navy Pier, Chicago, IL

Hotel Clermont, Atlanta, GA

Founder’s Landing, Marquette, MI

Fordson Island, Dearborn, MI

Guardian Industries

Guardian Industries, Michigan Locations

Energy Utility, Jackson, MI

Powerhouse and Paper Mill, Monroe, MI

Distribution Warehouse, Indianapolis, IN

Springs at Greenville, Greenville, SC

Compliance Solution for EECBG Program, Cook County, IL

Commercial Area, Ionia, MI

Henry Ford Cancer Care Center, Detroit, MI

Hotel St. Regis, Detroit, MI

Former La-Z-Boy Manufacturing Facility, Monroe, MI

Grandview Commons, Dexter, MI

Mosaic Eastern Market Redevelopment Project, Detroit, MI

Former Summit Place Mall Redevelopment Project, Waterford Township, MI

Lafayette West, Detroit, MI

The Cambria @ The Ashton, Detroit, MI

The Exchange Development, Kalamazoo, MI

Sharon Steel, Dearborn, MI

Cardinal Health, Detroit, MI

McCormick Place, Chicago, IL

Fueling Station, Tifton, GA

Industrial Warehouse, Huntersville, NC

Tao Restaurant, Chicago, IL

Fueling Station, Thomson, GA

Residential Condominium Development, Chicago, IL

Filling Station Redevelopment, Hampshire, IL

Sparta Foundry Area, Sparta, MI