Project Coordinator – Detroit, Michigan
Job Type: Full TimeHours/Week: 40Number of Openings: 1 Job Requirements: Preferred: Job Description: Successful candidate will work as part of a multi-disciplinary team in a
Job Type: Full TimeHours/Week: 40Number of Openings: 1 Job Requirements: Preferred: Job Description: Successful candidate will work as part of a multi-disciplinary team in a
Job Type: Full TimeHours/Week: 40Number of Openings: 1 Job Requirements: Preferred: Job Description: Successful candidate will work as part of a multi-disciplinary team in a
THE PROJECT The Middleground Landfill is located on Middleground Island in the Saginaw River and in Bay City, Michigan. The landfill is owned by the
THE PROJECT Bay City’s Fire Station has operated as a fire station since the days of horse drawn fire wagons. As a fire-fighting training location,
Environmental Assessment and Statutory Review of multiple properties utilizing Federal Housing and Urban Development (HUD) standards in Ohio THE PROJECT AKT Peerless was contracted by
Environmental remediation to allow re-development of a commercial property in Ohio THE PROJECT The proposed property in Norwood (Cincinnati metropolis) was developed as a strip
Pre-purchase due diligence and subsurface assessment of individual parcels and large tracts of land to identify and reduce potential risks at residential developments throughout Ohio
Preacquisition Due Diligence for prospective Purchaser and Financial institution in Ohio THE PROJECT AKT Peerless was asked by Comerica Bank to engage with a potential
Construction Loan Monitoring for twelve-story mixed-use residential development in Ohio THE PROJECT The proposed project consisted of renovating an existing twelve-story building for adaptive reuse
Construction Loan Monitoring for the transformation of a school building into a commercial office space in Ohio THE PROJECT The proposed project involved the adaptive
Oversight and Management of AoD AHERA Inspections, Training, and Implementation THE PROJECT The Archdiocese of Detroit (AoD) oversees a school district with jurisdiction over eighty
Leaking Underground Storage Tank Incident Closure THE PROJECT A gasoline release was reported at a national convenience store chain’s facility in Toulon, Illinois, during a
Construction loan monitoring for the renovation/redevelopment of a historical industrial building into a concert venue and office development in Chicago, Illinois. THE PROJECT One of
Phase II, Environmental Remediation and Program Enrollment THE PROJECT A major developer was ready to redevelop their property into a mixed-use commercial-residential high-rise. The property
Phase I, environmental remediation and underground storage tank removal services at a vacant lot in Illinois THE PROJECT The property had been sitting vacant for
Brownfield Redevelopment of Middle and High School Campus in Saginaw, Michigan THE PROJECT The Riverfront Campus Redevelopment project, spearheaded by Saginaw Future Inc. for the
Environmental Remediation and renovation of attached buildings into bar-restaurant and apartments THE PROJECT The redevelopment project in Bay City, Michigan, led by the Bay City
ACM Abatement and Project Management of operating U.S. Post Office THE PROJECT Comerica Bank serves as the trustee for a real estate development portfolio. One
AHERA-based asbestos sampling, consulting and project management services for Saginaw Public Schools THE PROJECT Saginaw Public Schools merged Arthur Hill High School and Saginaw High
Job Type: Full TimeHours/Week: 40Number of Openings: 1 Job Requirements: Preferred: Job Description: The successful candidate will work as part of a multi-disciplinary team in
The contents of this webpage are Copyright © 2024 AKT Peerless Environmental Services. All Rights Reserved.
Website & SEO By: MI Digital Solution